V0LTPOST-PILOT OPERATIONSPOST-PILOT OPERATIONS
STEP 2 · VERIFIED CAPACITY

Prove who can safely do the work.

Expansion is limited by fresh technician capacity, concurrent bench limits, open backlog and the maximum number of approved custody partners at the selected level.

Technician capacity profile

Record the tested operating limit—not an optimistic target.

Verified repair days

Capacity checks

Headroom remains protected at 80% of verified maximum.